Skip to Content
Agencies | Governor
Search Virginia.Gov

Westbound

Snow/Ice

VA-257W from Briery Branch Rd; Rt. 924E/W (Rockingham County) to the ramp from and to I-81N

Motorists can expect potential delays due to snowy or icy conditions.

WZ - Construction

VA-257W from 0.6 mi NE of Bridgewater to 0.6 mi N of Bridgewater

On VA-257 (Ottobine Rd) in the County of Rockingham from Dry River Rd; Rt. 738E/W (Rockingham County);DRY RIVER RD to Countryside Dr; Rt. 1314N/S (Rockingham County), motorists can expect potential delays in this area from 01/15/18 at 12:00 AM until 01/31/18 at 12:00 AM due to bridge work. All east lanes are mobile, alternating closures. All west lanes are mobile, alternating closures. Route 257 will be down to one lane until December 1, 2018, all traffic will be controlled by the temporary signal. The 13.0 feet is the maximum size vehicle that will be able to pass, no vehicles over 13.0 LF will be able to cross the modified bridge.

Eastbound

Snow/Ice

VA-257E from Briery Branch Rd; Rt. 924E/W (Rockingham County) to the ramp from and to I-81N

Motorists can expect potential delays due to snowy or icy conditions.

WZ - Construction

VA-257E from 0.6 mi NE of Bridgewater to 0.6 mi N of Bridgewater

On VA-257 (Ottobine Rd) in the County of Rockingham from Dry River Rd; Rt. 738E/W (Rockingham County);DRY RIVER RD to Countryside Dr; Rt. 1314N/S (Rockingham County), motorists can expect potential delays in this area from 05/16/17 at 8:24 PM until 12/31/18 at 12:00 PM due to bridge work. All east lanes are alternating closures. All west lanes are alternating closures. Route 257 will be cut down to one lane, a temporary signal has been installed and will be controlling traffic. A width restriction of 13.0 LF will be in place due to the bridge construction.
Site Map